REST API
Projects
Projects, summary, timeline, sprints, people, color, icon, repositories and the wall panel.
GET /projects(tracker:read): projects with the project type (kind:software,design,adminorsupport, and the name inkind_label), issue types (each one's level and, when there is one, thetemplatefor the text fields), status workflow, custom fields, labels, modules, the project color (color,#rrggbb) and icon (icon_url, with the same token, ornullwithout an icon: show the prefix in a box in the color) and the planned start and end (start_date,target_date, YYYY-MM-DD ornull). Use it before creating issues.GET /projects/{prefix, slug or id}(tracker:read): the project Summary, its first tab on screen.project(as inGET /projects),url,dates(start_date,target_date,days_elapsedsince the start,days_remainingto the end, negative once it's passed, andtime_progress, the fraction of the planned time already gone, from 0 to 1, with both dates),issues(total,open,done,late),active_sprint(ornull, withdays_left),next_release(the one with the nearest planned date that hasn't shipped, ornull),lateandupcoming(up to 5 open issues past due and with a due date ahead:code,title,due_date,assignee,url) andpeople(name,role). In the MCP:get_project.POST /projects(tracker:write; whoever configures some project, or an admin): creates a project,{"name": "Driver app", "prefix": "MOB", "kind": "software", "workflow": "software_qa", "description": "...", "color": "verde", "library_icon": "carro", "start_date": "2026-11-03", "target_date": "2027-02-26"}(start_dateandtarget_date, planned start and end, optional).kind:software(default),design,adminorsupport;workflow(software):software_qa(default),softwareorqa. Name and prefix are unique in the company (422 when they already exist, including in the trash). The creator joins as PO/PM. Returnsprojectas inGET /projects(andwarningif the color or icon couldn't be saved; try again withPATCH /projects/{ref}/brand). Creating from another project happens in the app. In the MCP:create_project.PATCH /projects/{prefix, slug or id}(tracker:write; PO/PM or admin in the project): planned start and end,{"start_date": "2026-11-03", "target_date": "2027-02-26"}; only what's sent changes andnullclears it. The start can't come after the end (422). Returnsproject,start_dateandtarget_date. In the MCP:plan_project.PATCH /projects/{prefix, slug or id}/brand(tracker:write, PO/PM or admin in the project): color and icon; only what's sent changes. JSON{"color": "verde", "library_icon": "carro-eletrico"}:coloris a palette name, in Portuguese (azul, violeta, rosa, vermelho, laranja, âmbar, verde, turquesa, grafite), or#rrggbb, andnullgoes back to the automatic color; the icon is one of three:library_icon(a ready-made icon, painted in the project color),image_base64(your own square icon, PNG, JPG or WebP up to 2 MB; ormultipart/form-datawith the image in theiconfield and the other fields as text) or"remove_icon": true(back to the prefix in the colored box). The ready-made icon is painted when it's set: changing only the color doesn't repaint it, so sendlibrary_iconagain along with the new color. In multipart, an emptycolorgoes back to automatic. Returnscolor,color_chosenandicon_url. In the MCP:set_project_brand.GET /project-icons(tracker:read): the library of 108 ready-made icons, by group, withslug,nameandurl(the drawing in black, transparent background);?query=eletricofilters by name, slug or group, without accents (the names are in Portuguese). In the MCP:list_project_icons.GET /projects/{prefix, slug or id}/people(tracker:read): the project's active people, with id and role. Use it to pick the assignee.GET /projects/{prefix, slug or id}/sprints(tracker:read): the project's planning: open sprints with their issues and points, the top of the backlog (backlog.totaland the first issues, in priority order) and the velocity of the last sprints.GET /projects/{prefix, slug or id}/timeline(tracker:read): the project Timeline.project(withstart_dateandtarget_date),url,can_plan(whether the person changes the issues' dates),items(issues with a start or due date, up to 300, open ones and those with the date closest to today first:code,title,status,category,closed,groupandgroup_kind, the row's epic or module,is_epic,sprint,assignee,start_date,due_date,first_dayandlast_dayof the bar,late,estimate_minutes,spent_minutes,url),truncated,dependencies(blocker,blockedandconflict, when the blocking one ends on or after the start of the blocked one),sprints,releases(with a planned date) andunscheduled(totaland up to 20 open ones without a start or due date). To change dates:PATCH /issues/{ref}/plan(the issue) andPATCH /projects/{ref}(the project). In the MCP:get_timeline.GET /projects/{prefix, slug or id}/repositories(tracker:read): connected GitHub repositories and GitLab projects, with the status each event applies, the last event received andconnection:github_app(the company's GitHub app),gitlab_token(tracker created and maintains the webhook in GitLab) orwebhook(set up by hand). Connecting and disconnecting happens in the app.GET /panel?project=(tracker:read): a project's wall panel in one call (board, help desk, releases, the week, charts andaqua.topics, aqua's ready-made questions, ornullwithout AI).GET /panel/aqua?project=&topic=(tracker:read): aqua's answer to one of those questions (overview, the default,attention,week,releasesandsupport, the last one only in a project with a help desk), as bullet points, withgenerated_at; the same question repeats the answer for 30 minutes.